— Design control

Release only after every gate is cleared

Every project passes five gates. Whether it is a charger bay, a switchgear room or a moulded enclosure, nothing is released until it clears each gate.

Built around the design and development controls of ISO 9001:2015, clause 8.3.

Design control gate sequence

Concept artwork (B&W) — not a site photograph. Real images go in Projects.

  1. 01

    Design Basis

    Customer requirement, site data and codes captured and frozen.

  2. 02

    Design Development

    Planned by discipline, with interfaces and owners defined.

  3. 03

    Review and Verification

    Cross-checks, safety and constructability reviews.

  4. 04

    Issued for Construction

    Approved, revision-controlled and released to site and shop floor.

  5. 05

    Change and As-Built

    Changes assessed and logged, records closed out.